Installed PV systems on municipal buildings
- Eichholz sheep barn 129kWp - Commissioning 2017
- Leutershausen town hall 8.68kWp - self-consumption system incl. surplus feed-in - commissioning 2023
- Kindergarten Wirbelwind Sudetenstraße 29.7kWp - self-consumption system incl. surplus feed-in - commissioning 2024
- Stadium grandstand 29.7 kWp incl. storage 22 kWh - self-consumption system incl. surplus feed-in - commissioning 2025
Planned PV systems on municipal buildings
- Construction yard new administration building approx. 30 kWp incl. storage 22 kWh - self-consumption system incl. surplus feed-in - commissioning expected in 2025
- Construction yard new cold and warm hall approx. 230 kWp - due to the current insufficient grid capacity, a connection is currently not possible, planning is on hold
- New gymnasium (noise protection wall on stadium grounds) approx. 30kWp incl. storage 22 kWh - self-consumption system incl. surplus feed-in - commissioning expected in 2025
- Fire station planned approx. 30kWp incl. storage 22 kWh - self-consumption system incl. surplus feed-in - commissioning expected in 2025
- Unfortunately, the two school buildings, the indoor swimming pool and the old gymnasium are not suitable for the installation of a PV system on the roof surfaces for structural reasons. The same applies to the new gymnasium. The PV system for the new gymnasium will therefore be installed on the noise barrier at the eastern end of the stadium site.