Installed PV systems on municipal buildings
- Eichholz sheep barn 129kWp - Commissioning 2017
- Leutershausen town hall 8.68kWp - self-consumption system incl. surplus feed-in - commissioning 2023
- Kindergarten Wirbelwind Sudetenstraße 29.7kWp - self-consumption system incl. surplus feed-in - commissioning 2024
- Grandstand stadium 29.7 kWp incl. storage 22 kWh - self-consumption system incl. surplus feed-in - commissioning 2026
- Construction yard new administration building 29.7 kWp incl. storage 22 kWh - self-consumption system incl. surplus feed-in - commissioning 2026
- New gymnasium (noise barrier on stadium grounds) 29.7 kWp incl. storage 22 kWh - self-consumption system incl. surplus feed-in - commissioning 2026
- Fire station planned 29.2 kWp incl. storage 22 kWh - self-consumption system incl. surplus feed-in - commissioning 2026
- Kulturhaus am Ochsenhof 12.8 kWp incl. storage 13.8 kWh - self-consumption system incl. surplus feed-in - commissioning 2026
Planned PV systems on municipal buildings
- Construction yard new cold and warm hall approx. 230 kWp - due to the current insufficient grid capacity, a connection is currently not possible, planning is on hold
- Unfortunately, the two school buildings, the indoor swimming pool and the old gymnasium are not suitable for the installation of a PV system on the roof surfaces for structural reasons. The same applies to the new gymnasium. The PV system for the new gymnasium will therefore be installed on the noise barrier at the eastern end of the stadium site.